Twist2 service Methodology is comprised of six progressive phases. Each successive phase ends in predefined deliverables. The six phases are "Plan >> Analyze >> Construct >> Transition >> Deploy >> Optimize". Depending on the complexity of companies, the total process regularly takes 3 ~ 6 months.

 

Plan

Objective: Introduction of Twist2 and customer project teams, assessment of client business needs and project planning.

Procedure:

  • Identify strategic goals
  • Assess critical information
  • Develop implementation strategy
  • Hold kickoff meeting
  • Define internal escalation policy

Outcome: Project is initiated and working relationships are established. High-level details are outlined.

Deliverables:

  • Initial Project Plan
  • Completion of project kickoff meeting

Analyze

Objective: Perform an audit of client business processes and requirements.

Procedure:

  • Business process analysis
  • Utilization workshop
  • Prepare Functional Requirements Specification (FRS)
  • Create Acceptance Test Plan (ATP)

Outcome: Fact finding stage is complete. Twist2 possesses a thorough understanding of client processes and requirements.

Deliverables:

  • Detailed Project Plan with tasks and major milestones
  • Business "Gap" analysis
  • Completed FRS
  • Completed Design Specification for custom solutions
  • Completed ATP

Construct

Objectives: Construction and Configuration of Twist2 system based upon approved FRS.

Procedure:

  • Build system
  • Build Configuration
  • Hold workshop
  • Identify enhancements
  • Continue configuration testing

Outcome: A completely configured, tested and operational Twist2 system.

Deliverables:

  • Constructed and completed Twist2 system
  • Final change controls

Transition

Objective: Install final Twist2 configuration and begin parallel testing.

Procedure:

  • Install Twist2 configuration with security scheme verified
  • Conduct final system acceptance testing
  • Continued knowledge transfer
  • Client system ownership established
  • Official transition to Twist2 support

Outcome: Accepted Twist2 LIMS or KMS system including users trained, data loaded and client ownership of configured Twist2 system.

Deliverables:

  • Installed Twist2 system ready for deployment
  • Executed ATP

Deploy

Objective: A Twist2 system being utilized in a production capacity.

Procedure:

  • Establish and implement a "Production Deployment" plan
  • Data loading completed
  • Parallel testing initiated
  • Go-live

Outcome: New Twist2 system is fully implemented and being utilized in a production capacity. Production environment that runs new applications and supports current and future business transactions. Satisfied internal customers, including management and PIs. On-going system assistance continues through Twist2 customer support.

Deliverables: Fully operational Twist2 solution

Optimize

Objective: Streamline the operational Twist2 system and make it as useful and as productive in the laboratory as possible.

Procedure:

  • Maximize utilization of Twist2 solution
  • Evaluated the need for additional consultative services after system has been in production for a period of time
  • Gather operational feedback from users

Outcome: Defined adjustments that will maximize the use of the Twist2 system capabilities.

Deliverables:

  • Plan for implementing enhancements
  • New configurations, reports, etc. as identified
  • Ongoing process

 